Laser_Wiretrap_Grid - PRJCT TeST_MoViNG

4.26.2017

 

 

 

   

 

 

 

Operation's Simulation

 

 

turrets are moving for the first time_

 

try to simulate a small situation with 3 couple of wiretraps to test connection and operativity_

 

All seems to work as defined in the initial theoric project_

 

 

 

Next step: configure data link interpretation between serial connection and max/msp_

 

 

 

 


 

 

 

 

 

 

 

 

1/3

 

 

 

 

 

 

 

Please reload

search_
Please reload