Laser_Wiretrap_Grid - PRJCT TeST_MoViNG
- cerraxca
- Apr 26, 2017
- 1 min read


Operation's Simulation
turrets are moving for the first time_
try to simulate a small situation with 3 couple of wiretraps to test connection and operativity_
All seems to work as defined in the initial theoric project_
Next step: configure data link interpretation between serial connection and max/msp_
Comments